6 Jan 11

Good Business Requirements Project PhotoCreating good business requirements will go a long way towards ensuring the success of the project and eliminate design and development risks that result from poor business requirements documentation. Here are the Top 10 Tips for Writing Good Business Requirements:

1.    Develop a clear understanding of the problems that the proposed software is being designed to solve. This will ensure that the subsequent business requirements document addresses those problems fully.

2.    Identify all project stakeholders and involve them in the business requirements gathering process from the start. Work to build trust and establish credibility early on so you can maintain stakeholder support throughout the project. Learn the individual personality traits of each stakeholder in order to be able to better manage them during the requirements phase of the project.

3.    Clearly document all business data including work flow, current problems, anticipated risks, and required performance metrics. Use project-approved tools and methodologies to ensure that the documentation conforms to the client’s requirements.

4.    Use approved templates for all documentation. Ensure that terms used throughout all documentation either exist in the project dictionary or are added as required. No one reading the business requirements document should encounter unfamiliar terms that cannot be quickly resolved by reviewing the project dictionary.

5.    Identify potential privacy and security issues early on so these problems can be mitigated to a level which satisfies the stakeholders that these risks have been managed properly. This helps to build trust and ensures that stakeholders remain committed to the project.

6.    Make a concerted effort to identify and document all risks, the impact of these risks on the project’s costs and timetable. This will avoid unexpected project delays as well as help control runaway costs.

7.    Conduct both group and one-on-one meetings to insure that all business requirements, risks and concerns are identified.

8.    Present a draft of the business requirements document to key stakeholders for preliminary review and tentative approval. This helps to ensure that the final business requirements document will be more easily accepted by all stakeholders when it is presented.

9.    Rewrite the draft business requirements document to address any issues discovered during step #8. This may requires repeating the stakeholder meeting process until you are sure that all issues have been identified and documented.

10.    Present the completed business requirements document to all stakeholders in a formal meeting. Take notes in order to maintain the collective project memory and be ready to address any issues or concerns which may be raised.

Filed under: Business

Trackback Uri






6 Jan 11

A durable coil color binding machine is a great device to get if you’re looking for document finishing equipment. One machine that may be right for you is the DFG OfficeCoil 300. This device has the following features:

  • The OfficeCoil 300 is a color coil binding machine that’s compatible with 4:1 pitch spines. When you punch your paper, you’ll notice that there are 4 holes punched per inch of paper. This is why you use 4:1 spines.
  • This machine can punch up to 10 sheets at time and since there’s an opening punching throat, you can use paper that’s up to 22” long. That makes this device very versatile because you’ll be able to bind documents of varying sizes.
  • The OfficeCoil 300 has a grooved roller to make coil insertion quick and easy. The roller is really durable so you can bind a lot of documents without any worries.
  • If you’re looking save space in your office, this would be a good machine to get. It only measures 17″ (width) x 11″ (depth) x 7″ (height) so it will be easy to find room for it. There are non-skid feet on the bottom of the device so it will stay in place as you’re working.
  • And last but not least, the OfficeCoil 300 has a one-year warranty.

You won’t be disappointed with the DFG OfficeCoil 300 if you give it a try. Check it out for yourself today.

Filed under: Uncategorized

Trackback Uri